Sabine River Authority Pump Station Additions

Sabine River Diversion Canal Improvements – Pump Station No. 3 and No. 4 Diesel Bypass Pump System

  • Owner: Sabine River Authority of Louisiana
  • Engineer: Meyer Engineers
  • Date of Completion: July 2013

Project Description:

Addition of 4 each 18” pumps at two separate pump stations. Slab on grade with metal covers, pumps and equipment installs, and pile supported suction intake were included.