Nova Chemical Geismar- Boiler Replacement & Ethylene Upgrades

Location

Owner

Nova Chemical Olefins

Engineer

Wink Engineering, LLC

General Contractor

Brown & Root Industrial Services, LLC

Status

Project Overview

This project at Nova Chemical included the installation of 14″ x 65′ ACIP piles, 8.625″ x 65′ helical piles, concrete demolition, and structural concrete and area paving.