Nova Chemical Geismar- Boiler Replacement & Ethylene Upgrades

Location
Owner
Nova Chemical Olefins
Engineer
Wink Engineering, LLC
General Contractor
Brown & Root Industrial Services, LLC
Status

No items found.
Project Overview
This project at Nova Chemical included the installation of 14″ x 65′ ACIP piles, 8.625″ x 65′ helical piles, concrete demolition, and structural concrete and area paving.