Petit Caillou Lock Structure

Owner
Terrebonne Parish Levee District
Engineer
GIS Engineering, inc.
Date of Completion
June 1, 2020
General Contractor
Sealevel Construction















No items found.
Project Overview
- Construction of 85’ x 115’ cofferdam with 55’ sheets and 20’ deep excavation
- Installation of (290) 60’ timber piles inside cofferdam
- Fabrication and installation of 31’ x 15’ miter gates
- Fabrication of walkways and handrails