Project Overview
Sealevel recently completed another turnkey site development project for an industrial client, transforming marsh into stable, workable land. The project’s scope included:
- marsh clearing/grubbing, placing 26,000 CY of sand embankment and 11,000+ tons of limestone
- construction of a 230’ x 80’ precast concrete platform, consisting of driving (164) 24” square precast concrete piles up to 225’ long and installing Waskey precast concrete capsills, struts, deck panels, and handrails
- installation of (115) 24” & 18” square precast concrete piles for other foundations, platforms and pipe supports
- on-site grouting mix for precast installation
- cast-in-place concrete for elevated compressor block foundation
- structural steel fabrication
Our team also applied their value engineering expertise to develop an alternative design for piperack support frames—resulting in significant cost savings and faster installation.