Morgan City Terminal Dock Repair

Location

Morgan City, La

Owner

Morgan City Harbor and Terminal District

Engineer

--

General Contractor

Sealevel Construction

Status

Completed in 2023

Project Overview

As the general contractor, Sealevel successfully completed a dock repair for Morgan City Harbor and Terminal District. Within budget and on schedule, the project included:

  • Over 3000 cy of cast-in-place concrete
  • 300 linear feet of sheet piles
  • (122) square precast concrete piles and (29) capsills
  • 270 linear feet of drainage pipe and catch basins
  • associated site work and rip rap placement