Morgan City Terminal Dock Repair
Location
Morgan City, La
Owner
Morgan City Harbor and Terminal District
Engineer
--
General Contractor
Sealevel Construction
Status
Completed in 2023
No items found.
Project Overview
As the general contractor, Sealevel successfully completed a dock repair for Morgan City Harbor and Terminal District. Within budget and on schedule, the project included:
- Over 3000 cy of cast-in-place concrete
- 300 linear feet of sheet piles
- (122) square precast concrete piles and (29) capsills
- 270 linear feet of drainage pipe and catch basins
- associated site work and rip rap placement