As the general contractor, Sealevel Construction completed the Hollywood Bridge, which was a 4 span bridge with two approach slabs and consisted of the following scope of work:

  • (35) 18” x 104” square concrete piles installed via trestle system
  • 254 lf of sheet piles installed along banks of canal
  • Spliced and installed (5) precast capsills 74’ in length
  • Formed & tied rebar for bridge, approach slabs and decorative red dyed sidewalks
  • Self-performed base work for asphalt work and approach slabs
  • Placement of rip rap along both banks of canal