Bayer Phase 2 Expansion

Location

Luling, La

Owner

Bayer

Engineer

--

General Contractor

Sealevel Construction

Status

Completed in 2022

Project Overview

Sealevel performed work throughout this industrial facility including:

  • Installation of (3) 80’ OD tank rings with 1800 cy of
  • interior slab and 300,000 lbs of rebar
  • Installation of pipe rack foundations and misc. supports
  • Installation of (230) 95’ displacement piles