Bayer Phase 2 Expansion

Location
Luling, La
Owner
Bayer
Engineer
--
General Contractor
Sealevel Construction
Status
Completed in 2022






No items found.
Project Overview
Sealevel performed work throughout this industrial facility including:
- Installation of (3) 80’ OD tank rings with 1800 cy of
- interior slab and 300,000 lbs of rebar
- Installation of pipe rack foundations and misc. supports
- Installation of (230) 95’ displacement piles