Bayou Teche Flood Control Structure

Owner
St. Mary Parish
Engineer
APTIM
Date of Completion
January 28, 2021
General Contractor
Sealevel Construction










No items found.
Project Overview
As the general contractor, Sealevel self-performed the majority of the project’s scope of work, which included:
• Construction of a flood wall consisting of sheet piles, plumb and battered piles
• Installation of mooring piles
• Construction of an earthen levee
• Installation of 84’ long, 40’ wide and 19’ tall steel floodgate
• Fabrication and installation of (2) jacket receiving structures, both measuring at 28’ tall x 75’ long