Bayou Teche Flood Control Structure

Owner

St. Mary Parish

Engineer

APTIM

Date of Completion

January 28, 2021

General Contractor

Sealevel Construction

Project Overview

As the general contractor, Sealevel self-performed the majority of the project’s scope of work, which included:

• Construction of a flood wall consisting of sheet piles, plumb and battered piles
• Installation of mooring piles
• Construction of an earthen levee
• Installation of 84’ long, 40’ wide and 19’ tall steel floodgate
• Fabrication and installation of (2) jacket receiving structures, both measuring at 28’ tall x 75’ long