Ellington Drainage Pump Station
Owner
St. Charles Parish
Engineer
BKI
Date of Completion
June 1, 2020
General Contractor
Sealevel Construction
No items found.
Project Overview
As the general contractor, Sealevel self-performed approximately 95% of the project. This project was a success, as it was completed on time, under budget and received excellent safety inspections throughout its duration. The project included the following:
- (82) 79’ long concrete piles
- (347) permanent steel sheet piles
- 1,464 cubic yards of concrete
- 1900 tons of 55lb rip rap
- 400 lf of handrails
- 65’ x 75’ cofferdam
- (4) 42” MWI pumps
- (4) 42” discharge pipes fabricated by Specks
- 250 horsepower electric motors