Ellington Drainage Pump Station

Location
Owner
St. Charles Parish
Engineer
BKI
General Contractor
Sealevel Construction
Status










No items found.
Project Overview
As the general contractor, Sealevel self-performed approximately 95% of the project. This project was a success, as it was completed on time, under budget and received excellent safety inspections throughout its duration. The project included the following:
- (82) 79’ long concrete piles
- (347) permanent steel sheet piles
- 1,464 cubic yards of concrete
- 1900 tons of 55lb rip rap
- 400 lf of handrails
- 65’ x 75’ cofferdam
- (4) 42” MWI pumps
- (4) 42” discharge pipes fabricated by Specks
- 250 horsepower electric motors