Ellington Drainage Pump Station

Owner

St. Charles Parish

Engineer

BKI

Date of Completion

June 1, 2020

General Contractor

Sealevel Construction

Project Overview

As the general contractor, Sealevel self-performed approximately 95% of the project. This project was a success, as it was completed on time, under budget and received excellent safety inspections throughout its duration. The project included the following:

  • (82) 79’ long concrete piles
  • (347) permanent steel sheet piles
  • 1,464 cubic yards of concrete
  • 1900 tons of 55lb rip rap
  • 400 lf of handrails
  • 65’ x 75’ cofferdam
  • (4) 42” MWI pumps
  • (4) 42” discharge pipes fabricated by Specks
  • 250 horsepower electric motors