Project Overview
Sealevel Construction worked at three separate Kinder Morgan facilities performing similiar scopes of work. At the largest site, Sealevel:
- installed 18” x 18” x 90’ square concrete piles and pipe supports
- installed precast caps and deck
- installed drilled shafts and concrete pier caps