Nitric Acid Storage Tank

Location

Luling, La

Owner

--

Engineer

--

General Contractor

--

Status

Completed in 2021

Project Overview

Sealevel worked with the project owner and engineers to perform (2) 400 KIP compression load tests before installing foundations for a new storage tank foundation. The project’s scope of work included:

  • the installation of (148) 7.626″ OD by 105′ long helical piles