Project Overview
Sealevel Construction was the general contractor for a bulkhead extension for Performance Contractors. Our portion of the expansion project included:
- 220′ long bulkhead wall using 60′ long sheet piles
- a tie-back system using 30′ long sheet piles and 1-3/4″ diameter tie rods
- installation of 2 steel 24″ mooring piles
- extension of a 54″ steel drainage pipe.