Port Allen Bulkhead Extension Project
Owner
Performance Contractors, inc.
Engineer
Leonard Chauvin, P.E., P.L.S., inc.
Date of Completion
June 1, 2020
General Contractor
Sealevel Construction, inc.
No items found.
Project Overview
Sealevel Construction was the general contractor for a bulkhead extension for Performance Contractors. Our portion of the expansion project included:
- 220′ long bulkhead wall using 60′ long sheet piles
- a tie-back system using 30′ long sheet piles and 1-3/4″ diameter tie rods
- installation of 2 steel 24″ mooring piles
- extension of a 54″ steel drainage pipe.