Port Allen Bulkhead Extension Project

Owner

Performance Contractors, inc.

Engineer

Leonard Chauvin, P.E., P.L.S., inc.

Date of Completion

June 1, 2020

General Contractor

Sealevel Construction, inc.

Project Overview

Sealevel Construction was the general contractor for a bulkhead extension for Performance Contractors. Our portion of the expansion project included:

  • 220′ long bulkhead wall using 60′ long sheet piles
  • a tie-back system using 30′ long sheet piles and 1-3/4″ diameter tie rods
  • installation of 2 steel 24″ mooring piles
  • extension of a 54″ steel drainage pipe.